UNION:  Bond levy on the ballot

UNION: Bond levy on the ballot

Potential Project List Union School District for Bond Levy November 2019
Tax rate of $1.10 per thousand of assessed value
Total: $4,000,000 Plus a $4,000,000 Match from ODE
• Security (Intercom/Clock/Bell- in every classroom, in all hallways, in all offices) $150,000
• Security (Card Key Access- All main entrances with vestibules and cameras to main offices) High School, Miller, Hutchinson, Gymnasium, Athletic complex $250,000
• Security (Cameras in main hallways, Gymnasiums, cafeteria, parking lots, and athletic complex) $75,000
• Roofing, windows, fixtures, furniture, flooring, paint, fencing, and sidewalk- Hutchinson $575,000
• Roofing, windows, fixtures, furniture, flooring, playground, and paint – Miller $585,000
• Roofing, windows, fixtures, furniture, flooring, and paint – Gymnasium $525,000
• Roofing, windows, fixtures, furniture, flooring, and paint – Music Room $135,000
• Removal of modular buildings and obsolete ductwork in High school $130,000
• Miller- Expansion of Miller Gym- Stage, Sound system, Student based health center, Storage $750,000
• Miller- Flooring in new gym space in Miller with movable backboards, nets, scoreboards, announcement system, and seating. $225,000
• HS- Repoint the brick and Creation of a commons area, windows, fixtures, furniture, flooring, paint, lockers, and sidewalk. $1,675,000
• HS- Resurface the front steps and Handicap access to all area of the high school. $975,000
• Gymnasium – Expansion of the foyer with new restrooms, new concessions, handicap access to foyer and bleachers, expansion of the wresting loft. $425,000
• Gymnasium – New gym floor, new announcement system, scoreboards, basket brackets, resurfacing bleachers with stain and paint. $325,000
• Update heating systems in all Buildings (Miller, Hutchinson, HS, Music, Gym) $575,000
• Resurfacing HS and Athletic complex parking lots $75,000
• Athletic Complex- Resurface Track with curbing on inside and outside. $500,000
• Athletic Complex- Two storage buildings for equipment and athletic supplies $125,000
Total Project Cost $8,000,000